|
|
|
|
This addition was designed with a pre-engineered frame with crane capacity and a pre-engineered roofing system. The siding is extremely unusual, horizontal siding with custom trim to match the existing building. Started in the dead of winter, the project was completed in early spring of 2005. It represents a good example of mixing building types to accomplish the needs of the owner.
|

|
| |
|
|
|
|