|
|
|
|
620 Construction designed and built a 6,000 sq.ft. masonry addition to an existing facility. This addition uses bar joist, and metal deck with conventional masonry bearing walls, bar post and deck with a rubber roof. This project was completed in the Spring of 2003. 620 built a second addition on the same property for the same landlord, but a different building. The second building utilized a metal pre-engineered package to match the number two building’s system.
|

View from Rte.18
|
| |
|
|
|
|