|
|
|
|
|
620 Construction worked with the Costa family operation by furnishing and erecting the 30,000 sf. field house and foundations. 620 was also instrumental in; the design of the facility, but the Costa family acted as the general contractor on this very efficient sports complex. Please note the clear span and height that the pre-engineered building provided. A mezzanine space was also designed into the space to utilize the area above the office and locker rooms.
|
|
| |
|
|
|
|